We use cookies to give you the best possible experience of our website. If you continue, we'll assume you’re happy for your web browser to receive all cookies from our website. See our cookie policy for more information on cookies and how to manage them.  OK

HEATHROW AIRPORT TERMINAL 2 LONDON

Show products in category HEATHROW AIRPORT TERMINAL 2 LONDON

Luxury & Comfort on Arrival

This was an incredibly intricate and challenging yet rewarding project. We had so many variables to overcome, from the client and interior designers based in Hong Kong to the sheer quantity of areas and fixtures to illuminate, coupled with complex dimming requirements. This project is a truly stunning example of interior lighting design.
Paul Evans, Retail and Business Development Director, Aurora Lighting

THE PROJECT

Location:
The Queen's Terminal, London Heathrow Airport

Client:
Plaza Premium Lounge, Level 4, Terminal 2

Project Completion:
May 2014

A snapshot

Designed in consultation with KCA Associates and the client, Plaza Premium Lounge, Aurora assisted on the successful execution of the only independent airport lounge accessible by all travellers at London Heathrow’s highly anticipated new Terminal 2 - The £2.5bn Queen’s Terminal.

The striking business class lounge is located airside and was designed to enhance the airport experience for travellers, regardless of the choice of airline or class of travel.

the solution
  • m10
  • Our m10 is part of our award winning mSeries™, the most advanced, integrated LED fire rated downlights which combine core technologies – Lighting DNA – designed to provide a maintenance-free product that delivers brighter light for longer.
  • Offering the only range of integrated LED downlights with a dimmable single-point light source powered by an IC chip, Aurora removed the need for an external driver and electrolytic capacitor.
  • Thermal management provides brighter light for longer and advanced optics deliver efficiency of light.
the OUTCOME
Result

The total lighting material cost of the project was in excess of £35,000. Aurora completed 6 similar projects between 2012 to 2014. At T2 Aurora used 150 lighting circuits consuming 4.5kw, 106 of these circuits employing a ‘Mode’ dimming system. The power density over the 592sqm area is 7.6w/sqm.

The project came runner up at the 2015 Lighting design awards in London.